About

A materials company that also has to answer for the installation

We develop the formulation, define the system and carry the project documentation. Production runs through a contract manufacturing partner; installation is delivered by our construction partner. Both boundaries are stated openly, because project teams check them.

Who we are

Positioning

LJXincai is the brand of Chengdu Quansheng Technology Service Co., Ltd. (tax ID 91510124MA65MJF26T), a prefabricated low-carbon new-material R&D and system solution provider. Our work covers four areas: material formulation, product system development, green and low-carbon certification preparation, and overall prefabricated retrofit solutions for public and commercial buildings.

The company is registered in Chengdu, Sichuan, with its office and technical team based in the Qingbaijiang district of the same city. Our market is existing-building retrofit — schools, hospitals, hotels, care facilities and offices — where the building stays in use while work proceeds.

Legal entity
Chengdu Quansheng Technology Service Co., Ltd.
Brand
LJXincai (砳姬新材), registered trademark Class 19, Reg. No. 77306966
Registered address
Deyuan Town, Pidu District, Chengdu, Sichuan
Office & technical base
Room 2, Floor 4, Building 2, No. 1188 Wannian Road, Qingbaijiang District, Chengdu 610300
Contact
sales@cdquansheng.cn · +86 199 3882 0738

“A supplier that hides the boundary between its own plant and its partner's plant will eventually be caught by a factory audit. We would rather state it on page one.”

LJXincai — disclosure policy
Manufacturing model

Who does what

Four parties, four separate responsibilities. This is the arrangement a project team should expect to see documented.

ActivityCarried out byNotes
Formulation, structure design, process standardChengdu Quansheng Technology Service Co., Ltd.Owned and controlled in-house
Volume productionChengdu Jinhaiba New Building Materials Co., Ltd.Independent legal entity; contract manufacturing partner; holds ISO 9001 / 14001 / 45001
Testing, certification and declaration preparationQuansheng, with third-party testing and verification bodiesDocuments issued in the product's name
Loading, container dispatch and export documentationOur production team, based at the manufacturing plantCoordinate packing, marking and shipping documents
On-site installationJimu Zhizhuang (construction partner)Prefabricated interior fit-out contractor; does not hold material certifications

We are not the owner of the production plant, and we do not describe ourselves as a manufacturer or factory. Material supply, project technical support and documentation are provided directly by Quansheng.

Verification status

Certificates, declarations and applications — current state

Project buyers need to know which documents exist, what they cover, and which are still in process. This table is kept current.

Document / statusScopeCurrent state
Environmental Product Declaration (EPD)Two wall-panel productsThird-party verification completed; statement issued with a qualified conclusion (limited assurance)
Product Carbon Footprint (PCF)Two wall-panel productsThird-party verification completed, same scope and limitation as above
Fire performancePanel productsClass B1 per GB 8624; test reports available
ISO 9001 / 14001 / 45001Manufacturing partnerHeld by Chengdu Jinhaiba New Building Materials Co., Ltd.
Green building material product certificationPanel productsApplication in progress — not yet issued
Invention patents (fixing node; coating process)System and coating technologyApplications under substantive examination — no rights granted to date
Trademark 砳姬®Class 19, building materialsRegistered, No. 77306966, valid to 2036

Documents are provided to project teams on request. We do not describe verification statements as certificates, and we do not describe pending applications as granted rights.

How we work on a project

Four steps, no surprises

Step 1

Scope review

Building type, area, substrate condition, operating constraints and the completion window. We confirm whether the system suits the space before quoting.

Step 2

System proposal & samples

Product selection, detail nodes, quantities and the document set required for approval. Physical samples issued for sign-off.

Step 3

Production & dispatch

Batch production against the approved sample, with inspection before packing. Loading and export documentation coordinated at the plant.

Step 4

Installation support

Installation guidance and site queries handled with the installation contractor; as-built issues documented for the next phase.